
So while you were exploring your own favorite trail, some new connections have opened up:
- Barton Creek Greenway: 0.7 miles
- Walker Branch (to Smith Rd): 0.6 miles
- Plum Creek Greenway: 0.66 miles
- Little Sugar Creek Greenway: Replacing an existing trail through Huntingtowne Farms Park, replacing a bridge across the creek, and adding a connector into the Starmount neighborhood
Connections that bring separate greenway sections together get a lot of attention, too — especially those on the Cross Charlotte Trail, or XCLT. Right now, cyclists and pedestrians enjoy riding the XCLT/Little Sugar Creek Greenway from Midtown Square to Freedom Park, over some Shared Streets and on-street connectors, and then on to Park Road Shopping Center. A gap from that point to the next pick-up at Tyvola Road, known as the “Brandywine to Tyvlola” section, is in the works for early 2022. There’s even a cool 3D flyover of the path on the county’s site: https://charlottenc.gov/Projects/Pages/XCLTBrandywineTyvola.aspx
From Tyvola, the Little Sugar Creek Greenway is smooth sailing all the way to I-485, with a new section reaching the Polk Birthplace Historic Site and the South Charlotte Connector very, very soon. That connection will allow access between the Little Sugar Creek Greenway/XCLT and another 5.5 miles of trails that are part of McMullen, Lower McAlpine, and Four Mile Creek Greenways.
Can you imagine riding greenways from NoDa to Rea Road in one trip? Yeah, we’re smiling too. Here’s the current timetable, with links, from Lloyd:
- Little Sugar Creek Greenway/XCLT (7th to 10th) (completed by City): 0.5 miles: https://charlottenc.gov/Projects/Pages/XCLT7thto10th.aspx Projected for completion in late 2021
- Little Sugar Creek Greenway/XCLT (Brandywine to Tyvola) (completed by City): 1.5 miles: https://charlottenc.gov/Projects/Pages/XCLTBrandywineTyvola.aspx Projected for completion in late 2021/early 2022
- Little Sugar Creek Greenway/XCLT (Polk to State Line): 2.9 miles: https://charlottenc.gov/Projects/Pages/XCLTPolkToSC.aspx Projected for completion in mid 2022
Mecklenburg County’s greenway system is now being viewed as an important link to the region’s transportation system in the 2040 plan. Commuting never looked healthier, and connections to public transportation are getting easier than ever. Lloyd calls the next 100 miles of greenways “transformational” for the city.
“That can really change how people move around – when you have a protected network separate from cars,” says Lloyd. “It changes how you move around the city.”
So maybe the analogy about trains and greenways isn’t so far-fetched. With the Lynx light rail line being an important transportation mode for Charlotte’s future, and greenways designed as accessible connections to get to it, they’re both really rolling!

News You May Be Interested In
U.S. Play Coalition Recognizes Doug Youngblood’s Contribution to ‘The Power of Play’
If you knew Doug Youngblood, you know he believed in the “Power of Play.” For decades, Doug shared his energy and influence with…
Greenway Ride with Partners for Parks and Sustain Charlotte Brings Out a Crowd
It was a beautiful day for a ride on Mecklenburg County’s ever-growing, popular linear park. On Saturday, March 19, more than 70…
A Big Thank You to Our Sponsors!
We are grateful for all of our Sponsors who support Partners for Parks as we make a very specific impact on equity and inclusion,…
Partners for Parks and Sustain Charlotte Join Forces for More Greenways
Working together makes advocacy stronger, and Partners for Parks is teaming up with Sustain Charlotte to push for more greenways…
Partners for Parks is hosting a Spring Sponsor Celebration
Do you enjoy delicious food, craft beer, and a nice glass of wine? Can't wait to reconnect with friends and fellow lovers of parks…
Remembering Our Friend, and a Friend to Parks and Play, Doug Youngblood
It was with heavy hearts we learned of Doug Youngblood’s passing just before Christmas, following his 5-year battle with cancer.…







